SCHOOL, MUNICIPAL & HOSPITAL PROJECTS

SCHOOL,

MUNICIPAL,

HOSPITAL

PROJECTS

Green Lantern Solar partners with numerous public sector entities to provide complete solar solutions that guarantee significant savings on utility bills. No land or No roof needed, and No cost to you!

SchoolProjects

The Mount Mansfield Modified Union School District is excited to be participating with Green Lantern on these solar projects. The economic, environmental, and social benefits are meaningful for our schools. We are always interested in opportunities with companies that represent local interests. The projects will provide most of our annual power needs, thereby reducing our annual operating budget. They dovetail perfectly with our goals to work towards environmental sustainability and support our communities.

                             - John Alberghini, Superintendent, Chittenden East Supervisory Union

Schools -  A 500kW array provides power to local Barre schools to significantly offset utility costs...

Brownfield reclamation, Schools - GLS repurposed a former gravel pit to house a 500kW array that provides 1 MWH of power...

NORTHERN VT UNIVERSITY SOLAR

A 500kW array in West Burke provides the university with approximately 1MW of electricity...

NORTHERN VT UNIVERSITY SOLAR
Clarendon.jpg
ESSEX-WESTFORD SCHOOL DIST.

Brownfield-1 - 500kW and 4- 150kW arrays located throughout VT provide the school district with significant savings to their operating budget. 3 capped landfills house 3 of the arrays...

Schools - Green Lantern collaborated with the Waterbury Local Energy Action Partnership and SunCommon to develop and finance...

JOHNSON ELEMENTARY SCHOOL

150kW array is located on a private lot in Johnson, VT. This array provides the Johnson Elem. school with significant savings...

SHELBURNE TOWN SCHOOL

 A 500kW array in Sharon produces approximately 850,000kW annually to help offset school utility bills...

CAMBRIDGE ELEMENTARY SCHOOL

Landfill - A capped landfill in Cambridge, VT is the site of this 500kW array that provides savings for the Cambridge Elem. school.

Newbury- colchester.jpg
COLCHESTER SCHOOL DISTRICT

A 500kW array in Newbury, VT provides the Colchester School District with net metering credits that saves them big on their utility bills.

Enosburg.jpg
ENOSBURG SCHOOLS SOLAR

A 500kW array located in Enosburg, VT helps the towns schools save on utility bills.

Pine Hill- spaulding HS.jpg
SPAULDING HIGH SCHOOL SOLAR

A 500kW array located in Montpelier, VT provides Spaulding High School with net metering credits that provide them with major savings on utility bills.

Mont Vert - lyndon state college.jpg
CHITTENDEN EAST SUPERVISORY UNION SOLAR

A 500kW array in Proctor, VT provides the supervisory union with net metering credits that help them save on operating costs .

THATCHER BROOK PRIMARY SCHOOL

A 500kW array in Waterbury, VT provides their local primary school with nete metering credits to help them save on utility bills.

Pine Hill- spaulding HS.jpg
SOUTH ROYALTON SCHOOLS

A 500kW array located in Montpelier, VT provides Spaulding High School with net metering credits that provide them with major savings on utility bills.

Brownfield reclamation, Schools - GLS repurposed a former gravel pit to house a 500kW array that provides 1 MWH of power...

Schools  - 2 - 500kW arrays provide over 1.7 MW of electricity to MMU High School, Browns River Middle...

Schools -district utility bills are significantly offset by power generated from a 500kW array on private land in Sharon.

Schools  - Constructed on a vacant field neighboring a utility transmission line, this 252 kW array...

Schools  - 150kW, commercial-scale solar array is located on a decommissioned, Cold War era missile silo site in Alburgh. 

MunicipalProjects

 Two 500kW arrays are the cornerstone of Montpelier's 100% renewable energy initiative...

Brownfield reclamation- a former gravel pit, owned by the town, houses a 500kW array that provides 875,00kWH...

Brownfield reclamation- GLS worked with a local farmer to repurpose and old stump dump...

A 150kW array provides Richmond with significant savings on utility bills...

TOWN OF CAMBRIDGE SOLAR

Landfill - A capped landfill in Cambridge, VT is the site of this 500kW array that provides...

TOWN BERLIN SOLAR

Location: Essex, VT

System size: 500 kW

Completion date: April 2019

TOWN OF TROY SOLAR

The 150kW, commercial-scale solar array is located on a decommissioned, Cold War era missile silo site in Alburgh...

TOWN & VILLAGE OF ESSEX SOLAR

A 500kW array in Essex provides the Town and Village of Essex with ...

TOWN OF BRANDON SOLAR

Coming soon...

Read More >

Brownfield reclamation - 500kW array located in an industrial park in Springfield powers the Town of Springfield and the Springfield schools

Brownfield Reclamation  - a former gravel pit is the site of a 500kW array that helps power the town of Northfield...

150kW array is located on a private lot in Johnson, VT. This array provides the town of Johnson with significant savings...

Gravel pit - A 150 kW array constructed on a closed gravel pit in Royalton provides the town of Castleton with significant...

Constructed on a vacant field neighboring a utility transmission line, this 252 kW array produces over 400 MWh annually.  The Village of Bellows Falls

HospitalProjects
BRATTLEBORO MEMORIAL HOSPITAL SOLAR

Green Lantern Solar provided a turn-key solar solution to Southern Vermont's leading medical facility.

Two 500kW arrays..